On August 14, the digital design and construction application of CHN Energy Dadu River Jinchuan Hydropower Plant won the Special Award at the 4th “New Infrastructure Cup” China Smart Construction and BIM Application Competition.
Jinchuan Hydropower Plant has a total installed capacity of 860 megawatts. Aiming to build a high-quality and world-leading project, the hydropower plant has continuously carried out multidisciplinary and full-phase BIM design, BIM-based multi-source data management, excavation management, geological forecasting, feedback analysis, and safety monitoring. This has facilitated digital construction and application throughout the entire lifecycle of the project, providing a unified collaboration platform for all participants and ensuring the safe management and lean execution of the project.